Low Valtellina · Mazzoni Costruzioni
Construction company in Buglio in Monte
A building at the Selvetta and one on the Buglio in Monte side ask different questions about access and delivery. Indicates the precise location along with the works you want to accomplish.
Photography from the archive of the enterprise.
The local context
An intervention at Buglio in Monte starts from the place.
The territory of Buglio in Monte rises from the Selvetta plain to the rhetic side, with the inhabited place above the valley floor.
Municipality · ↗Preparing the project
Distinguish work on the floor and on the side
For a production building in the lower part you describe maneuvers, loads and accesses of suppliers. For a house on the side are useful sections of the soil and images of the differences. Specify the context allows you to set the comparison on the actual needs of the intervention. Attach a relief allows you to read also the external fittings.
Areas of intervention
Skills for your project
Renovations
Work on existing buildings to improve their functionality, structure and spatial quality while respecting the original building.
↗ depthsCivil and industrial buildings
Construction and work on residential, production and office buildings, coordinated from the operational phase through to handover.
↗ depthsRoads and urban infrastructure
Road works, underground utilities, paving, walls and urban infrastructure for public bodies, businesses and private clients.
↗ depthsUseful Questions
Before starting
What information do I send to Buglio in Monte?
Start from these elements: precise location, altitudes of the soil, movements of the means. Add the available drawings and a description of the objective: they will serve to agree on the following in-depth studies.
From project to request
Collect information about Buglio in Monte and the property before the first confrontation. You can use the checklist and prepare a message with the already selected municipality.