Low Valtellina · Mazzoni Costruzioni
Construction company in Cino
For an intervention at Cino, on the Cech Coast, it identifies the route to the property and the available spaces. This information is also useful for a limited renewal of the interior.
Photography from the archive of the enterprise.
The local context
An intervention at Cino starts from the place.
Cino is located on the Cech Coast and its territory develops halfway, without extending to the valley floor.
Municipality · ↗Preparing the project
Give space to the organization of the yard
In the recovery of a house on the Coast it is advisable to check together input, possibility of storage and internal handling. Note if the route includes steps or pedestrian traits: this detail affects the organization even when the surface to be restored is contained. It carries out these conditions even when you require only internal works.
Areas of intervention
Skills for your project
Renovations
Work on existing buildings to improve their functionality, structure and spatial quality while respecting the original building.
↗ depthsCivil and industrial buildings
Construction and work on residential, production and office buildings, coordinated from the operational phase through to handover.
↗ depthsRoads and urban infrastructure
Road works, underground utilities, paving, walls and urban infrastructure for public bodies, businesses and private clients.
↗ depthsUseful Questions
Before starting
What information do I send to Cino?
Start from these elements: pedestrian traits, scales and dislivelli, area available for materials. Add the available drawings and a description of the objective: they will serve to agree on the following in-depth studies.
From project to request
Collect information about Cino and the property before the first confrontation. You can use the checklist and prepare a message with the already selected municipality.