Sondrio and Valmalenco · Mazzoni Costruzioni
Construction company in Piateda
From the valley floor to the mountain nuclei of Piateda, a building recovery must be described building by building. Indicates links, shared parts and object of the works.
Photography from the archive of the enterprise.
The local context
An intervention at Piateda starts from the place.
Piateda includes several mountain hamlets and valleys, including Val Venina and Val d'Ambria; Ambria houses stone houses.
Local source ↗Preparing the project
Preparing the recovery of connected buildings
If the property includes house, stable or barn, it identifies the bodies separately and their future use provided by the project. Pictures of neighbouring links and walls help to read the interference. For mountain resorts, it also defines the practicable route to reach the property.
Areas of intervention
Skills for your project
Renovations
Work on existing buildings to improve their functionality, structure and spatial quality while respecting the original building.
↗ depthsCivil and industrial buildings
Construction and work on residential, production and office buildings, coordinated from the operational phase through to handover.
↗ depthsRoads and urban infrastructure
Road works, underground utilities, paving, walls and urban infrastructure for public bodies, businesses and private clients.
↗ depthsUseful Questions
Before starting
What information do I send to Piateda?
Start from these elements: bodies and intended destinations, bordering masonry, practicable path. Add the available drawings and a description of the objective: they will serve to agree on the following in-depth studies.
From project to request
Collect information about Piateda and the property before the first confrontation. You can use the checklist and prepare a message with the already selected municipality.